Immutable dated receipt · 12 September 2026
Fresh verified Home + Work current-view evidence. The 11 September receipt remains unchanged.
TSP_ACTIVE_ARENAS_LIVE_EXTRACTS_20260912_155656_303809.zip · SHA-256 5dabea48c9e522ecc02fbcef86c18b9a27b608287db2b9b69efb08df51c93c8dTSP_ACTIVE_ARENAS_LIVE_EXTRACTS_20260912_154113_789517.zip · SHA-256 8e1be0497d68f8f31d2127b1b9dba7f4d07a1d70e510317959b0898af525f189
| Line | Fresh evidence | Assessment |
|---|---|---|
| TSPES | 5/9 exact; lu980 11,355 vs 11,340; gap 0.132275% | RUNNING · flagship · plateau watch |
| DEV2.3 | cycle 19; P7 active; campaign incumbent 96,780 | RUNNING · incumbent predates P7 |
| DEV2.4 HF3 | generation 23,442; 374,483 proposals; best 96,780; validation PASS | RUNNING · tied donor |
| BD-RPHS W4 | cycle 120; 966 chunks; active best 79,374; historical null-control 79,288 | RUNNING · causal attribution open |
| 8zTSP-R v0.1.1 | 9/9 committed instance snapshots; latest mu1979 round 37; current nu3496 | RUNNING · relational-native research |
| 8zTSP-R v0.2.0 MVC | generation 2; 8/64 proposals; committed best 43,487; visits_completed 0 | RUNNING · EARLY; committed progress disproves a zero-visits stall inference |
Claim boundary. No DEV2.4 superiority, RPHS causal win, v0.1.1 product competitiveness, or MVC performance advantage is claimed. A zero completed-visit counter is not treated as a stall when committed generation/proposal/checkpoint state is advancing.